Apocalypse How Mods (
apocalypsehowmods) wrote in
apocalypsehowooc2022-08-01 08:54 am
![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
![[community profile]](https://www.dreamwidth.org/img/silk/identity/community.png)
Entry tags:
Activity Check Update
Activity Check Update
Hi Team,
This is an early reminder for AC and an announcement! After some player confusion and internal discussions, the mods have determined that we need to modify and clarify our Activity Check requirements. We hope this will make things easier for everyone! To sum it up as simply as possible: We are going to begin allowing players to use two threads (combined) for one proof each month. So, if you have two network threads that are 5 tags long each, you can combine those to get to the 10 tag requirement for a network post proof.
We have the language that has been updated on the AC page below. Please let us know if you have any questions!
You May
This is an early reminder for AC and an announcement! After some player confusion and internal discussions, the mods have determined that we need to modify and clarify our Activity Check requirements. We hope this will make things easier for everyone! To sum it up as simply as possible: We are going to begin allowing players to use two threads (combined) for one proof each month. So, if you have two network threads that are 5 tags long each, you can combine those to get to the 10 tag requirement for a network post proof.
We have the language that has been updated on the AC page below. Please let us know if you have any questions!
You May
- Check-in for your first month.
- Use inbox threads for proofs.
- Use TDM threads as
half of yourproofs. - Use two of the same type of proof (e.g., two 5-comment log threads or two 10-comment network threads or two top-levels)
- Combine two threads to reach the log or network comments requirement for ONE proof.
- Submit a proof for AC that you have used in a previous month.
- Submit proofs that are dated outside the AC month. Please note that while AC is checked from the 1st to the 5th, all AC proofs must be from the AC month. E.g., April AC proofs must be dated from 1 - 30 April. Proofs that include dates in May are not valid for April.
- Combine two threads to reach the log or network comments requirement for BOTH proofs. I.e. You cannot submit two threads less than the minimum proof length to meet the 5-log or 10-network tag requirements for more than one of your proofs.
- Submit an open top-level and then one of the threads to come from that top-level as separate proofs. (EXCEPTION: You may submit a post/top-level one month, then use the threads within that post/top-level in following months if they reach the appropriate AC-length within the month.)